This client’s turbine fuel compression system utilized (4) Gas Packs; (1) for every (2) turbines to boost gas pressure from 10 to the required 75 psig. These gas packs have been inadequate for meeting the fuel pressure requirements and have experienced reliability issues since being installed because of lower than expected gas supply pressure. The gas compression system installed by Regatta Solutions replaced the Capstone Gas Packs with a single gas compressor system with redundant compressors for increased reliability.
Gas Compression
This client’s turbine fuel compression system utilized (4) Gas Packs; (1) for every (2) turbines to boost gas pressure from 10 to the required…